INJ-00026 — cooling_water_fouling

Status: EXPIRED · Category: A · Source: auto Fired at: 104.27 h · Duration: 8.0 h · Target: NE-01 Economic impact: $-315 /h

Parameters

{
  "fouling_pct": 21,
  "plant_id": "NE-01",
  "product": "LIN",
  "customer_id": "C-13",
  "truck_id": "T-E02",
  "driver_id": "D-E05"
}

Cascade — 10 agent steps

#stepagentdetail
1INJECTIONInjection Enginecooling_water_fouling: CW heat exchanger fouled. Supply temp rising to 34°C (design 26°C). MAC aftercooler less effective.
2MPC_SOLVEMPC Optimizer📐 MPC: Optimal load 83% (4h horizon) | Priority: 3 | Expected margin: $0/h | Reason: All constraints healthy → optimize revenue (+load)
3PHYSICSPhysics KernelFouled CW tubes reduce heat transfer coefficient. MAC discharge temp rises. Compressor efficiency drops as back-pressure increases. CW health at 75%.
4PRODUCTIONProduction AgentReducing 80%→75% to lower heat rejection load. At 75%, MAC power drops from 23MW to ~22MW.
5TANKSTank Inventory AgentLower production → slower tank fill. LOX at 60%, LIN at 61%. Higher ambient heat also increases boiloff ~10%.
6DISPATCHDispatch AgentNormal dispatch continues. No emergency action needed unless CW temp exceeds 35°C (thermal runaway risk).
7CUSTOMERSCustomer Impact AgentShort-term impact minimal. Extended fouling (>12h) may affect customers with <3d inventory.
8LOSS_MITIGATIONLoss Ledger📉 L1: Primary Production Physical Balance — SENS monitors CW temps to prevent excess boil-off losses
9ECONOMICSEconomics AgentCW fouling costs ~3-5k. ROI: cleaning pays for itself in <24h.
10RECOVERYRecovery Planner1) CW chemical cleaning crew dispatched. 2) Tube brushing + biocide treatment. 3) Duration 4-8h. 4) Post-clean: CW temp returns to 26°C design.

Raw effects

  1. CW temp +2K, health 79%
  2. cooling_water_fouling: CW heat exchanger fouled. Supply temp rising to 34°C (design 26°C). MAC aftercooler less effective.
  3. 📐 MPC: Optimal load 83% (4h horizon) | Priority: 3 | Expected margin: $0/h | Reason: All constraints healthy → optimize revenue (+load)
  4. Fouled CW tubes reduce heat transfer coefficient. MAC discharge temp rises. Compressor efficiency drops as back-pressure increases. CW health at 75%.
  5. Reducing 80%→75% to lower heat rejection load. At 75%, MAC power drops from 23MW to ~22MW.
  6. Lower production → slower tank fill. LOX at 60%, LIN at 61%. Higher ambient heat also increases boiloff ~10%.
  7. Normal dispatch continues. No emergency action needed unless CW temp exceeds 35°C (thermal runaway risk).
  8. Short-term impact minimal. Extended fouling (>12h) may affect customers with <3d inventory.
  9. 📉 L1: Primary Production Physical Balance — SENS monitors CW temps to prevent excess boil-off losses
  10. CW fouling costs ~3-5k. ROI: cleaning pays for itself in <24h.
    1. CW chemical cleaning crew dispatched. 2) Tube brushing + biocide treatment. 3) Duration 4-8h. 4) Post-clean: CW temp returns to 26°C design.