INJ-00023 — tractor_breakdown

Status: EXPIRED · Category: D · Source: auto Fired at: 92.17 h · Duration: 6.0 h · Target: T-E01 Economic impact: $-400 /h

Parameters

{
  "truck_id": "T-E01",
  "product": "LIN",
  "customer_id": "C-18",
  "driver_id": "D-E01"
}

Cascade — 10 agent steps

#stepagentdetail
1INJECTIONInjection Enginetractor_breakdown: truck T-E01 engine/transmission failure. Cannot continue route. Tow required.
2MPC_SOLVEMPC Optimizer📐 MPC: Optimal load 67% (4h horizon) | Priority: 3 | Expected margin: $0/h | Reason: All constraints healthy → optimize revenue (+load)
3PHYSICSPhysics KernelNo plant impact. Trailer product safe in insulated vessel. But truck is immobile — product stranded.
4PRODUCTIONProduction AgentNo production change. Load stays at 64%.
5TANKSTank Inventory AgentLOX at 60%, LIN at 61%. One truck offline for 6-12h reduces total fleet capacity.
6DISPATCHDispatch AgentSend replacement tractor to transfer trailer. Reroute T-E01’s remaining stops. Fleet capacity reduced ~10%.
7CUSTOMERSCustomer Impact AgentMultiple customers delayed. Customers with <2d inventory get priority reassignment to other trucks.
8LOSS_MITIGATIONLoss Ledger📉 L3: Central Tracking vs Actual Deliveries — HUB dispatches replacement tractor to limit heat soak
9ECONOMICSEconomics AgentTow: 2-10k depending on failure. Lost delivery capacity: 6-12h at 1 truck.
10RECOVERYRecovery Planner1) Tow dispatched for T-E01. 2) Transfer trailer to replacement tractor (2h). 3) Tractor to shop for repair (6-36h). 4) Resume with replacement.

Raw effects

  1. Truck T-E01 breakdown
  2. tractor_breakdown: truck T-E01 engine/transmission failure. Cannot continue route. Tow required.
  3. 📐 MPC: Optimal load 67% (4h horizon) | Priority: 3 | Expected margin: $0/h | Reason: All constraints healthy → optimize revenue (+load)
  4. No plant impact. Trailer product safe in insulated vessel. But truck is immobile — product stranded.
  5. No production change. Load stays at 64%.
  6. LOX at 60%, LIN at 61%. One truck offline for 6-12h reduces total fleet capacity.
  7. Send replacement tractor to transfer trailer. Reroute T-E01’s remaining stops. Fleet capacity reduced ~10%.
  8. Multiple customers delayed. Customers with <2d inventory get priority reassignment to other trucks.
  9. 📉 L3: Central Tracking vs Actual Deliveries — HUB dispatches replacement tractor to limit heat soak
  10. Tow: 2-10k depending on failure. Lost delivery capacity: 6-12h at 1 truck.
    1. Tow dispatched for T-E01. 2) Transfer trailer to replacement tractor (2h). 3) Tractor to shop for repair (6-36h). 4) Resume with replacement.