INJ-00022 — vaporizer_degradation

Status: EXPIRED · Category: A · Source: auto Fired at: 89.95 h · Duration: 8.0 h · Target: NE-01 Economic impact: $-200 /h

Parameters

{
  "plant_id": "NE-01",
  "product": "LIN",
  "customer_id": "C-16",
  "truck_id": "T-E03",
  "driver_id": "D-E05"
}

Cascade — 10 agent steps

#stepagentdetail
1INJECTIONInjection Enginevaporizer_degradation: ambient air vaporizer fins corroded/fouled. Heat transfer reduced. Sendout rate limited.
2MPC_SOLVEMPC Optimizer📐 MPC: Optimal load 64% (4h horizon) | Priority: 2 | Expected margin: $0/h | Reason: Swarm [SWARM-0026|periodic_review]: reduce load by 4% to min
3PHYSICSPhysics KernelVaporizer converts LOX→GOX for pipeline delivery. Degraded fins = lower vaporization rate = bottleneck on gaseous product delivery.
4PRODUCTIONProduction AgentHOLD at 64%. Production unaffected but delivery limited. More product goes to tank storage.
5TANKSTank Inventory AgentLOX at 60%. LOX tank may rise above target if vaporizer bottleneck persists. Watch for PSV risk at >90%.
6DISPATCHDispatch AgentMore product delivered as liquid (truck) instead of gas (pipeline). Dispatch rate may need to increase.
7CUSTOMERSCustomer Impact AgentPipeline customers see reduced pressure/flow. Switch them to truck delivery temporarily if possible.
8LOSS_MITIGATIONLoss Ledger📉 L1: Primary Production Physical Balance — SENS detects sendout drop, PROC reroutes to reduce flash
9ECONOMICSEconomics AgentPipeline GOX is cheapest delivery. Switching to truck adds $0.03-0.05/kg logistics cost. Revenue margin drops ~15%.
10RECOVERYRecovery Planner1) Clean vaporizer fins (high-pressure wash). 2) If corroded: schedule fin replacement. 3) Duration: 4-8h for cleaning, 2-3 days for replacement.

Raw effects

  1. Vaporizer degraded at NE-01
  2. vaporizer_degradation: ambient air vaporizer fins corroded/fouled. Heat transfer reduced. Sendout rate limited.
  3. 📐 MPC: Optimal load 64% (4h horizon) | Priority: 2 | Expected margin: $0/h | Reason: Swarm [SWARM-0026|periodic_review]: reduce load by 4% to min
  4. Vaporizer converts LOX→GOX for pipeline delivery. Degraded fins = lower vaporization rate = bottleneck on gaseous product delivery.
  5. HOLD at 64%. Production unaffected but delivery limited. More product goes to tank storage.
  6. LOX at 60%. LOX tank may rise above target if vaporizer bottleneck persists. Watch for PSV risk at >90%.
  7. More product delivered as liquid (truck) instead of gas (pipeline). Dispatch rate may need to increase.
  8. Pipeline customers see reduced pressure/flow. Switch them to truck delivery temporarily if possible.
  9. 📉 L1: Primary Production Physical Balance — SENS detects sendout drop, PROC reroutes to reduce flash
  10. Pipeline GOX is cheapest delivery. Switching to truck adds $0.03-0.05/kg logistics cost. Revenue margin drops ~15%.
    1. Clean vaporizer fins (high-pressure wash). 2) If corroded: schedule fin replacement. 3) Duration: 4-8h for cleaning, 2-3 days for replacement.