INJ-00018 — semiconductor_restart_surge

Status: EXPIRED · Category: E · Source: auto Fired at: 75.52 h · Duration: 12.0 h · Target: T-E04 Economic impact: $-1,000 /h

Parameters

{
  "customer_id": "C-13",
  "product": "LIN",
  "truck_id": "T-E04",
  "driver_id": "D-E01"
}

Cascade — 10 agent steps

#stepagentdetail
1INJECTIONInjection Enginesemiconductor_restart_surge: fab C-13 restarting after maintenance. LAR and LIN demand doubles for 12h.
2MPC_SOLVEMPC Optimizer📐 MPC: Optimal load 83% (4h horizon) | Priority: 3 | Expected margin: $0/h | Reason: All constraints healthy → optimize revenue (+load)
3PHYSICSPhysics KernelFab restart requires massive inert gas purge. LAR consumption 2x normal. LIN for cooling 1.5x normal.
4PRODUCTIONProduction AgentRAMPING 80%→80% to increase LAR/LIN production. LAR is highest-margin product ($0.65/kg).
5TANKSTank Inventory AgentLAR at 46%, LIN at 61%. Fab restart drains LAR tank ~2x faster. LAR adequate for surge.
6DISPATCHDispatch AgentPriority LAR dispatch to C-13. All available LAR trucks routed to fab. Other LAR customers deprioritized.
7CUSTOMERSCustomer Impact AgentFab C-13: $500k+/h revenue at stake. Contamination from gas interruption = wafer scrap. Other LAR customers delayed.
8LOSS_MITIGATIONLoss Ledger📉 L1: Primary Production Physical Balance — PROC pre-ramps gradually, maintains meter accuracy
9ECONOMICSEconomics AgentFab restart premium: LAR at 28/h.
10RECOVERYRecovery Planner1) Fab purge completes in 12h. 2) Demand returns to baseline. 3) Ramp load back down. 4) Refill LAR tank during off-peak.

Raw effects

  1. semiconductor_restart_surge: C-13 has no LIN+LAR — surged LOX instead
  2. semiconductor_restart_surge: fab C-13 restarting after maintenance. LAR and LIN demand doubles for 12h.
  3. 📐 MPC: Optimal load 83% (4h horizon) | Priority: 3 | Expected margin: $0/h | Reason: All constraints healthy → optimize revenue (+load)
  4. Fab restart requires massive inert gas purge. LAR consumption 2x normal. LIN for cooling 1.5x normal.
  5. RAMPING 80%→80% to increase LAR/LIN production. LAR is highest-margin product ($0.65/kg).
  6. LAR at 46%, LIN at 61%. Fab restart drains LAR tank ~2x faster. LAR adequate for surge.
  7. Priority LAR dispatch to C-13. All available LAR trucks routed to fab. Other LAR customers deprioritized.
  8. Fab C-13: $500k+/h revenue at stake. Contamination from gas interruption = wafer scrap. Other LAR customers delayed.
  9. 📉 L1: Primary Production Physical Balance — PROC pre-ramps gradually, maintains meter accuracy
  10. Fab restart premium: LAR at 28/h.
    1. Fab purge completes in 12h. 2) Demand returns to baseline. 3) Ramp load back down. 4) Refill LAR tank during off-peak.