INJ-00016 — jt_valve_stiction

Status: EXPIRED · Category: A · Source: auto Fired at: 71.35 h · Duration: 3.0 h · Target: NE-01 Economic impact: $-500 /h

Parameters

{
  "plant_id": "NE-01",
  "product": "LAR",
  "customer_id": "C-08",
  "truck_id": "T-E03",
  "driver_id": "D-E06"
}

Cascade — 10 agent steps

#stepagentdetail
1INJECTIONInjection Enginejt_valve_stiction: JT valve stem sticking causes pressure oscillations. HP column flooding at 83%.
2MPC_SOLVEMPC Optimizer📐 MPC: Optimal load 75% (4h horizon) | Priority: 3 | Expected margin: $0/h | Reason: All constraints healthy → optimize revenue (+load)
3PHYSICSPhysics KernelJT valve controls HP→LP pressure letdown. Stiction causes cycling → flooding oscillations → separation quality degrades. Surge margin affected.
4PRODUCTIONProduction AgentHOLD at 75%. Reducing load would worsen stiction (lower ΔP). Valve needs mechanical repair.
5TANKSTank Inventory AgentLOX at 60%, LIN at 61%. Flooding oscillations reduce liquid production efficiency by 5-10%.
6DISPATCHDispatch AgentNormal dispatch continues. Monitor GOX purity — flooding can cause O2 carryover.
7CUSTOMERSCustomer Impact AgentPurity risk: if flooding pushes O2 purity below 99.5%, semiconductor/medical customers cannot accept product.
8LOSS_MITIGATIONLoss Ledger📉 L1: Primary Production Physical Balance — SENS detects JT stiction, schedules maintenance
9ECONOMICSEconomics AgentJT stiction reduces production efficiency ~5%. Revenue impact: -2-5k. Downtime: 2-4h.
10RECOVERYRecovery Planner1) Stroke JT valve to break stiction. 2) If persistent: isolate and repair valve trim. 3) Duration: 2-4h. 4) Post-repair: smooth pressure control restored.

Raw effects

  1. JT stiction, HP flood +8% at NE-01
  2. jt_valve_stiction: JT valve stem sticking causes pressure oscillations. HP column flooding at 83%.
  3. 📐 MPC: Optimal load 75% (4h horizon) | Priority: 3 | Expected margin: $0/h | Reason: All constraints healthy → optimize revenue (+load)
  4. JT valve controls HP→LP pressure letdown. Stiction causes cycling → flooding oscillations → separation quality degrades. Surge margin affected.
  5. HOLD at 75%. Reducing load would worsen stiction (lower ΔP). Valve needs mechanical repair.
  6. LOX at 60%, LIN at 61%. Flooding oscillations reduce liquid production efficiency by 5-10%.
  7. Normal dispatch continues. Monitor GOX purity — flooding can cause O2 carryover.
  8. Purity risk: if flooding pushes O2 purity below 99.5%, semiconductor/medical customers cannot accept product.
  9. 📉 L1: Primary Production Physical Balance — SENS detects JT stiction, schedules maintenance
  10. JT stiction reduces production efficiency ~5%. Revenue impact: -2-5k. Downtime: 2-4h.
    1. Stroke JT valve to break stiction. 2) If persistent: isolate and repair valve trim. 3) Duration: 2-4h. 4) Post-repair: smooth pressure control restored.