INJ-00010 — power_price_spike

Status: EXPIRED · Category: E · Source: auto Fired at: 53.99 h · Duration: 4.0 h · Target: T-E05 Economic impact: $-6,650 /h

Parameters

{
  "product": "LAR",
  "surge_pct": 53,
  "customer_id": "C-10",
  "truck_id": "T-E05",
  "driver_id": "D-E06"
}

Cascade — 10 agent steps

#stepagentdetail
1INJECTIONInjection Enginepower_price_spike: grid electricity spiked to 45-55). Duration: 1-4h.
2MPC_SOLVEMPC Optimizer📐 MPC: Optimal load 79% (4h horizon) | Priority: 2 | Expected margin: $0/h | Reason: Swarm [SWARM-0016|economic_threshold]: ACTION must be a S
3PHYSICSPhysics KernelNo equipment impact. Economic event. MAC drawing 21MW at 3156/h power cost.
4PRODUCTIONProduction AgentCURTAILING 79%→69% to reduce power consumption. Draw from tank inventory during spike.
5TANKSTank Inventory AgentLOX at 60%, LIN at 61%. Tanks healthy — can ride out 4h spike.
6DISPATCHDispatch AgentContinue normal dispatch from tank inventory. Tanks drain ~5%/h faster without full production replenishment.
7CUSTOMERSCustomer Impact AgentNo customer impact if tanks >40%. If extended spike + low tanks: prioritize critical customers.
8LOSS_MITIGATIONLoss Ledger📉 L1: Primary Production Physical Balance — PROC shifts load to off-peak, maintains production balance
9ECONOMICSEconomics AgentCurtailment saves 36/h. Net savings: $280/h.
10RECOVERYRecovery Planner1) Monitor grid price. 2) When price drops below $60/MWh, ramp back to normal. 3) Refill tanks during off-peak. 4) Expected: 1-4h.

Raw effects

  1. Power 55)
  2. power_price_spike: grid electricity spiked to 45-55). Duration: 1-4h.
  3. 📐 MPC: Optimal load 79% (4h horizon) | Priority: 2 | Expected margin: $0/h | Reason: Swarm [SWARM-0016|economic_threshold]: ACTION must be a S
  4. No equipment impact. Economic event. MAC drawing 21MW at 3156/h power cost.
  5. CURTAILING 79%→69% to reduce power consumption. Draw from tank inventory during spike.
  6. LOX at 60%, LIN at 61%. Tanks healthy — can ride out 4h spike.
  7. Continue normal dispatch from tank inventory. Tanks drain ~5%/h faster without full production replenishment.
  8. No customer impact if tanks >40%. If extended spike + low tanks: prioritize critical customers.
  9. 📉 L1: Primary Production Physical Balance — PROC shifts load to off-peak, maintains production balance
  10. Curtailment saves 36/h. Net savings: $280/h.
    1. Monitor grid price. 2) When price drops below $60/MWh, ramp back to normal. 3) Refill tanks during off-peak. 4) Expected: 1-4h.