INJ-00007 — driver_hos_exhaustion

Status: EXPIRED · Category: D · Source: auto Fired at: 29.11 h · Duration: 10.0 h · Target: T-E03 Economic impact: $-200 /h

Parameters

{
  "driver_id": "D-E06",
  "product": "LIN",
  "customer_id": "C-13",
  "truck_id": "T-E03"
}

Cascade — 10 agent steps

#stepagentdetail
1INJECTIONInjection Enginedriver_hos_exhaustion: driver D-E06 reached FMCSA Hours-of-Service limit. 10h mandatory rest period.
2MPC_SOLVEMPC Optimizer📐 MPC: Optimal load 83% (4h horizon) | Priority: 3 | Expected margin: $0/h | Reason: All constraints healthy → optimize revenue (+load)
3PHYSICSPhysics KernelNo plant impact — logistics event. FMCSA compliance: 11h driving max, 14h on-duty max, 10h off-duty required.
4PRODUCTIONProduction AgentNo production change. Load stays at 80%.
5TANKSTank Inventory AgentLOX at 59%, LIN at 61%. Fewer drivers = slower delivery = tanks may accumulate.
6DISPATCHDispatch AgentLost 1 of 6 drivers for 10h. Remaining drivers cover priority routes. Multi-stop routes to maximize coverage.
7CUSTOMERSCustomer Impact AgentNon-critical customers delayed 6-10h. P1 customers (hospitals, fabs) served by remaining drivers first.
8LOSS_MITIGATIONLoss Ledger📉 L3: Central Tracking vs Actual Deliveries — HUB pre-checks HOS, reassigns before violation extends transit
9ECONOMICSEconomics AgentDeferred deliveries, not lost revenue. SLA penalty risk: 800-1200/trip.
10RECOVERYRecovery Planner1) D-E06 enters mandatory rest (10h). 2) Remaining drivers reassigned. 3) After rest: driver returns to full duty. 4) Consider staggering shifts to prevent clustering.

Raw effects

  1. Driver D-E06 HOS limit — must rest 10h
  2. driver_hos_exhaustion: driver D-E06 reached FMCSA Hours-of-Service limit. 10h mandatory rest period.
  3. 📐 MPC: Optimal load 83% (4h horizon) | Priority: 3 | Expected margin: $0/h | Reason: All constraints healthy → optimize revenue (+load)
  4. No plant impact — logistics event. FMCSA compliance: 11h driving max, 14h on-duty max, 10h off-duty required.
  5. No production change. Load stays at 80%.
  6. LOX at 59%, LIN at 61%. Fewer drivers = slower delivery = tanks may accumulate.
  7. Lost 1 of 6 drivers for 10h. Remaining drivers cover priority routes. Multi-stop routes to maximize coverage.
  8. Non-critical customers delayed 6-10h. P1 customers (hospitals, fabs) served by remaining drivers first.
  9. 📉 L3: Central Tracking vs Actual Deliveries — HUB pre-checks HOS, reassigns before violation extends transit
  10. Deferred deliveries, not lost revenue. SLA penalty risk: 800-1200/trip.
    1. D-E06 enters mandatory rest (10h). 2) Remaining drivers reassigned. 3) After rest: driver returns to full duty. 4) Consider staggering shifts to prevent clustering.