INJ-00006 — tank_pressure_cv_leak
Status: EXPIRED · Category: A · Source: auto Fired at: 27.05 h · Duration: 4.0 h · Target: NE-01 Economic impact: $-400 /h
Parameters
{
"product": "LAR",
"leak_rate_pct": 24,
"plant_id": "NE-01",
"customer_id": "C-10",
"truck_id": "T-E02",
"driver_id": "D-E02"
}Cascade — 13 agent steps
| # | step | agent | detail |
|---|---|---|---|
| 1 | INJECTION | Injection Engine | LAR tank CV leak at NE-01 |
| 2 | MPC_SOLVE | MPC Optimizer | tank_pressure_cv_leak: LAR vent valve stuck 24% open (MODERATE). Leak rate: 2.4 kg/s. |
| 3 | PHYSICS | Physics Kernel | 📐 MPC: Optimal load 83% (4h horizon) | Priority: 3 | Expected margin: $0/h | Reason: All constraints healthy → optimize revenue (+load) |
| 4 | PRODUCTION | Production Agent | Vent valve 24% open — LAR vaporizes and escapes at 2.4 kg/s (8640 kg/h). Boiloff rate 2.5x normal. Tank pressure rising, PSV may lift if valve not isolated. |
| 5 | TANKS | Tank Inventory Agent | Reducing load 80%→77% (3% cut) to slow LAR production into leaking tank. At 77% load, LAR production drops from ~0.0 to ~0.0 kg/s. Less product entering leaking tank = less product lost. |
| 6 | DISPATCH | Dispatch Agent | LAR tank at 49% (55150 kg). Drain rate: 2.4 kg/s from vent + customer demand + boiloff. At this rate, tank reaches critical 15% in ~3.4h. |
| 7 | CUSTOMERS | Customer Impact Agent | 🔀 GCN: Route optimization active — 52-feature node embeddings × learned edge weights. Blending 70% distance + 30% GCN-learned delivery outcome weights. |
| 8 | LOSS_MITIGATION | Loss Ledger | Emergency dispatch triggered via tank.overflow event — HUB agent routes trucks to load LAR and deliver to customers. Maintenance crew also dispatched for valve repair. |
| 9 | ECONOMICS | Economics Agent | During vent leak, LAR production is reduced AND inventory is draining. Customers with <2 days inventory are at stockout risk. Priority dispatch to P1 tier. Estimated 4 customers affected. |
| 10 | RECOVERY | Recovery Planner | 💱 Procurement: Evaluating spot buy/sell — proactive purchase at <1.5d for P1/P2 customers at 2.5x markup (cheaper than 3x emergency). Spot sell if tanks >85% and demand low. |
| 11 | STEP_10 | STEP_10 | 📉 L1: Primary Production Physical Balance — SENS detects abnormal boil-off, flags CV leak for inspection |
| 12 | STEP_11 | STEP_11 | Product loss: 2.4 kg/s x 4320/h lost to atmosphere. Load reduction: 80%→77%. Net impact: -$4331/h. |
| 13 | STEP_12 | STEP_12 | 1) Valve isolation crew en route (ETA 30min). 2) Temporary clamp to reduce leak rate. 3) Full valve replacement takes 2-4h. 4) After repair: ramp load back to 80%, rebuild LAR inventory over 4-6h. |
Raw effects
- LAR vent valve STUCK OPEN — losing 2.4 kg/s
- LAR tank CV leak at NE-01
- tank_pressure_cv_leak: LAR vent valve stuck 24% open (MODERATE). Leak rate: 2.4 kg/s.
- 📐 MPC: Optimal load 83% (4h horizon) | Priority: 3 | Expected margin: $0/h | Reason: All constraints healthy → optimize revenue (+load)
- Vent valve 24% open — LAR vaporizes and escapes at 2.4 kg/s (8640 kg/h). Boiloff rate 2.5x normal. Tank pressure rising, PSV may lift if valve not isolated.
- Reducing load 80%→77% (3% cut) to slow LAR production into leaking tank. At 77% load, LAR production drops from ~0.0 to ~0.0 kg/s. Less product entering leaking tank = less product lost.
- LAR tank at 49% (55150 kg). Drain rate: 2.4 kg/s from vent + customer demand + boiloff. At this rate, tank reaches critical 15% in ~3.4h.
- 🔀 GCN: Route optimization active — 52-feature node embeddings × learned edge weights. Blending 70% distance + 30% GCN-learned delivery outcome weights.
- Emergency dispatch triggered via tank.overflow event — HUB agent routes trucks to load LAR and deliver to customers. Maintenance crew also dispatched for valve repair.
- During vent leak, LAR production is reduced AND inventory is draining. Customers with <2 days inventory are at stockout risk. Priority dispatch to P1 tier. Estimated 4 customers affected.
- 💱 Procurement: Evaluating spot buy/sell — proactive purchase at <1.5d for P1/P2 customers at 2.5x markup (cheaper than 3x emergency). Spot sell if tanks >85% and demand low.
- 📉 L1: Primary Production Physical Balance — SENS detects abnormal boil-off, flags CV leak for inspection
- Product loss: 2.4 kg/s x 4320/h lost to atmosphere. Load reduction: 80%→77%. Net impact: -$4331/h.
-
- Valve isolation crew en route (ETA 30min). 2) Temporary clamp to reduce leak rate. 3) Full valve replacement takes 2-4h. 4) After repair: ramp load back to 80%, rebuild LAR inventory over 4-6h.